Rep: 【速報】上海M13 etc
Breaking News!
Line 5 south extension and line 13 phase II, III in Shanghai are officially announced to open on the 30th December!
There's basically no more news about line 5 south extension ever since I put it on the list, but here it comes on the last minute, with line 13 opening as scheduled.
There's basically no more news about line 5 south extension ever since I put it on the list, but here it comes on the last minute, with line 13 opening as scheduled.
The route map.
Starting from the 30th December, line 5 will operate as a main line (Xinzhuang - Fengxian Xincheng) and a branch line (Dongchuan Road - Minhang Development Zone). The main line will be run by 6-car trains and the branch line by 4-car trains. A transfer is required at the Dongchuan Road station between the main and the branch line.
As shown on the chart, passengers from the main line (Platform No. 1/2) need to move to Platform No. 3/4 for the branch line and vice versa.
I will do a follow-up report by then just for sure, but more importantly, to mark out another line on our list!
* This blog post was supposed to have been posted on the 28th December.
Comments
Post a Comment